Qualify
Pulls grade, thickness, width, product form, tonnage, coating, tolerance, and delivery window from the inquiry, then flags anything missing.
Forgepoint for steel mills
Frank turns mill inquiries, specifications, and prior orders into a reviewable quote by checking grade, thickness, width, coating, quantity, base price, and extras.
See the steel-mill workflowCardinal Structural
Ready to qualifyHi, need pricing as soon as you can. A572 Grade 50, 0.250 in thick by 48 in wide, approximately 400 tons, hot-rolled pickled and oiled. Releases are planned through the third quarter. Mill test reports are required.
How Frank handles the RFQ
Pulls grade, thickness, width, product form, tonnage, coating, tolerance, and delivery window from the inquiry, then flags anything missing.
Checks the inquiry against your rolling and finishing capability, base price, and the extras schedule for grade, gauge, width, and processing. Frank then sends the draft quote to your team for human approval.
Builds a customer-ready quote with tonnage bands, release terms, and freight details, then tracks replies and follow-up.
Logs the inquiry, specs, MTR requirements, and revisions in the systems your team already uses.
Steel-mill context
Frank checks each inquiry against the grades, thicknesses, widths, coatings, production limits, pricing extras, and approval rules your mill configures.
Frank turns each inquiry into a reviewable draft quote by checking the grades, dimensions, coatings, extras, lead times, and approval rules your mill maintains.
FAQ
No. Frank assembles the inquiry, capability check, extras, and draft pricing so your desk focuses on judgment calls and the customer relationship.
Frank identifies ASTM, ASME, and API requirements in the inquiry, then checks them against the grades and specifications your mill is configured to quote.
Yes. Frank uses your base price, grade, thickness, width, and processing extras, along with the approval limits your team sets.
Frank flags missing details such as coating weight or finish, tolerance, quantity, and release schedule, then drafts a customer question for your team to review.
No. Frank organizes the inquiry and flags missing specifications so engineering and metallurgy teams can focus on exceptions and technical review.
Yes. Human approval rules control which quotes and messages are released.
