Qualify
Pulls the required process, specification and revision, finish type or class, lot quantity, part dimensions, masking, and test requirements from the RFQ and print, then flags anything missing.
Forgepoint for metal finishers
Frank pulls the process, specification, part size, lot quantity, masking, and test requirements from the RFQ. Frank checks them against the coating lines or furnaces and pricing rules you provide, then prepares a quote for review.
See the finishing workflowKestrel Fabrication
Ready to qualifyHi, need pricing for zinc plating on the attached parts. Finish is AMS-QQ-P-416 Type II. Quantity is 3,200. Mask the two threaded bores. We also need a 96-hour salt spray test report. Our customer is waiting, so please send price and lead time by Friday.
How Frank handles the RFQ
Pulls the required process, specification and revision, finish type or class, lot quantity, part dimensions, masking, and test requirements from the RFQ and print, then flags anything missing.
Checks part size and quantity against your rack, batch, line, or furnace limits, then applies your process, masking, fixture, and test pricing. Frank then sends the draft quote to your team for human approval.
Builds a customer-ready quote with process and quantity pricing, tracks whether the buyer opens it, and schedules follow-up.
Logs the RFQ, spec sheets, test reports, and quote revisions in the systems your team already uses.
Finishing context
Frank checks each RFQ against the coating or heat-treatment processes, shop limits, quality requirements, and pricing rules you provide. If the process fit is not clear, Frank flags the job for review.
Frank turns each RFQ into a reviewable draft quote by checking the processes, shop limits, pricing rules, quality requirements, and approved lead times.
FAQ
No. Frank assembles the RFQ, spec check, and draft pricing so your desk focuses on judgment calls and the customer relationship.
Frank reads the finish callout, revision, type, class, and compliance requirements, then checks them against the processes your shop has documented.
Frank uses the process prices, masking labor, fixture costs, and approval limits your team sets.
Frank flags missing masking areas, specification revision, finish class, and test-report requirements, then drafts a customer question for review.
No. Frank assembles the specification, masking, test, and pricing information. Your engineers and process experts still make the technical and approval decisions.
Frank separates coating and heat-treatment requirements and checks each only against the documented processes your shop offers.
Yes. Human approval rules control which quotes and messages are released.
