Qualify
Pulls material, gauge, part geometry, annual volume, release schedule, PPAP level, and secondary operations from the RFQ and print, then flags anything missing.
Forgepoint for metal stampers
Frank pulls the material, gauge, annual volume, PPAP requirements, and secondary operations from the RFQ. Frank checks them against the presses, tooling records, and pricing rules your team provides, then prepares a quote for review.
See the stamping workflowRidgeline Automotive Components
Ready to qualifyHi, need a quote on the attached bracket. Material is 0.090 in thick cold-rolled steel. Annual volume is 180,000 pieces with quarterly releases. One corner has a draw feature. PPAP Level 3 is required for a new vehicle program. The part print and PPAP requirements are attached. Need pricing this week for our sourcing deadline.
How Frank handles the RFQ
Pulls material, gauge, part geometry, annual volume, release schedule, PPAP level, and secondary operations from the RFQ and print, then flags anything missing.
Checks the part against your press range, tooling records, coil pricing, and secondary-operation rates. Frank then sends the draft quote to your team for human approval.
Builds a quote with tooling and piece prices by annual-volume band, tracks whether the buyer opens it, and schedules follow-up.
Logs the RFQ, part prints, die revisions, and PPAP submission requirements in the systems your team already uses.
Stamping context
Frank checks each RFQ against the press, tooling, quality, and pricing rules you provide. If the fit is not clear, Frank flags the job for estimator review.
Frank turns each RFQ into a reviewable draft quote by checking your press list, tooling records, pricing rules, quality requirements, and approved lead times.
FAQ
No. Frank assembles the RFQ, die and tonnage check, and draft pricing so your desk focuses on judgment calls and the customer relationship.
Frank pulls the print requirements and checks them against the tooling and press rules you provide. Your estimator approves the process and press selection.
Yes. Frank uses your piece-price bands, tooling amortization terms, and approval limits.
Frank flags missing information, including PPAP level, secondary operations, annual volume, and release schedule, then drafts a customer question for review.
No. Frank assembles the print, tooling, and costing information. Engineers and estimators still make the process, tooling, and approval decisions.
Frank matches the part number and revision to tooling on file. For new tooling, Frank flags the process choice and routes it to the estimator instead of choosing a die type.
Yes. Human approval rules control which quotes and messages are released.
