Qualify
Pulls material, GD&T, surface finish, critical features, quantity, and first-article requirements from the print and model. Frank flags missing information and any routing or fixturing decision that needs estimator review.
Forgepoint for CNC machine shops
Frank pulls material, quantity, tolerances, surface finish, and inspection requirements from the RFQ, print, and model. Frank checks those inputs against the machines, estimating rules, and rates your team provides, then prepares a quote for review.
See the machining workflowTalbot Flow Controls
Ready to qualifyHi, attached are the model and print for a valve body. Material is 17-4 PH stainless. The four mounting bores have a 0.005 in. position tolerance. We need 40 prototype pieces with a first-article inspection; production volume follows approval. Please send pricing this week.
How Frank handles the RFQ
Pulls material, GD&T, surface finish, critical features, quantity, and first-article requirements from the print and model. Frank flags missing information and any routing or fixturing decision that needs estimator review.
Checks the part against your machine envelope, axis and process rules, material cost, setup assumptions, and cycle-time model. Frank then sends the draft quote to your team for human approval.
Builds a quote with separate prototype and production pricing, tracks whether the buyer opens it, and schedules follow-up.
Logs the RFQ, prints, models, and inspection reports in the systems your team already uses.
Machining context
Frank checks each RFQ against the machine, tolerance, inspection, and pricing rules you provide. If the routing or process fit is not clear, Frank flags the part for estimator review.
Frank turns each RFQ into a reviewable draft quote by checking your machine list, work envelopes, tolerance rules, estimating inputs, inspection capabilities, and approved lead times.
FAQ
No. Frank assembles the RFQ, model context, and draft pricing so your estimator focuses on judgment calls and the customer relationship.
Frank pulls GD&T callouts and model data, then checks them against the machine and tolerance rules you provide. Your estimator approves the routing.
Frank uses the machine rates, setup assumptions, cycle-time model, and approval limits your team sets.
Frank flags missing tolerances, surface finish, inspection requirements, quantities, and material information, then drafts a customer question for review.
No. Frank assembles the print, model, inspection, and costing information. Engineers, machinists, and estimators still make the routing and approval decisions.
Yes. Frank keeps prototype and production quantities as separate price breaks and flags tolerance or geometry that needs senior machinist or estimator review.
Yes. Human approval rules control which quotes and messages are released.
